VBC | Manufacturing

4233 Chestnut

The last module for 4233 Chestnut will be shipping on October 15! We appreciate the team for working to get this prepared to ship in coordination with the VBC | Construction team in Philadelphia.

19th Street

With the last module for 4233 Chestnut shipping out on October 15, we should begin shipping 19th Street the third week of October. The team is excited to see this project come together soon!

510 N. Broad

Production has begun on 510 N. Broad street. We are working on manufacturing phase 1 now. We will began Manufacturing phase II week of October 19th- 23rd .

We appreciate our team working to increase speed and efficiency.

VBC | Construction

American Street

All hands are on deck!  The VBC | Construction Team is trying to push through numerous obstacles in their effort to bring the project to a close.  COVID delays associated with our elevator contractor have slowed their installation coupled with a major Floor Preventive PWD infrastructure project directly in the path of the building resulting in establishing permanent utilities and demands a lot of logistical creativity to keep a forward momentum to complete the goal.  We are confident that this project will conclude in the next few months. Overall, the building looks absolutely beautiful and will be a welcome addition to the Northern Liberties community.

19th Street

The foundation is complete and steel is currently being erected.  The VBC | Construction Team is planning on an early November modular set.  Transport of the modules is being coordinated with VBC | Manufacturing now and should be on the road in the coming week.  The staging area is being secured and traffic routes are also being coordinated.  Albeit one of the smaller VBC projects currently under construction, site logistics are and will remain a challenge throughout construction.  We are planning for a substantial completion in January 2021.

4233 Chestnut

The second phase of modular is currently being set (a total of 80 boxes). Set is slated for ten (10) days. The VBC | Manufacturing and Preconstruction Teams are transitioning duties to the VBC | Construction field team. Meanwhile, the 4233 Construction Team has mobilized the chosen sub-contractor trades who are beginning all of the interior MEP connections. VBC is working closely with HOW Properties to bring a collaborative effort in completing the next addition to the Alterra Property Group’s portfolio. This apartment building will surpass the previous project VBC performed for APG at 4125 Chestnut Street.