cM Tower of London

citizenM's Flagship Hotel At The Tower Of London: Completed In Three Months

A BREEAM-Certified 370-Unit Hotel.

The Tower of London hotel was a flagship development for citizenM. This modular hotel houses extensive meeting facilities, a rooftop bar, and a mission for sustainability.

The 10-story steel-framed modular building uses only LED lights, limits plastic use, and was installed on a steel podium to dramatically reduce construction time. The citizenM team worked only at night to complete this project, as it was built upon Tower Hill right opposite Tower Castle, a UNESCO World Heritage Site.

The Tower of London build not only earned a new construction BREEAM Excellent certification but also an in-use BREEAM Good certification.

Timeline

24 Months
Total Construction Time
days
11 Weeks
Module Set Time
finished
6 Months
Estimated Time Saved vs. Traditional Construction

Building Specs:

  • Number of Units: 370
  • Number of Modules: 252
  • Square Footage: 68,839 SF | 6,395 M2
  • Asset Class: Hospitality
  • Total Project Levels: 9
  • Total Modular Levels: 8

Project Team:

  • Owner: citizenM
  • Developer: citizenM
  • Architect of Record: Concrete Architectural Associates
  • Modular Installer: Vistal
  • General Contractor: Balfour Beatty
Tower of London Exterior

Photo Gallery

Image 2
Room Overlooking Tower of London and Tower Bridge
Tower of London Exterior (1)
Completed Hotel
Image 3
Room Overlooking Trinity Square, London
Image 1
Shower and Signature Vanity

Project Location

View more projects...

Modern Features with a Built-In Grocery Store

410 Multi-Family Market Rate Apartments

LVL North - 510 N. Broad St. Philadelphia, PA

citizenM Washington NoMa

296 Furnished Hotel Rooms

1222 First St NE, Washington DC 20002

A Future Forward Premium Steel Build

250 Unit Hospitality Build

Airport Way, Luton Airport, UK

Modern Amenities for Multi-Family Apartments

237 Market-Rate Units

Solo 4233, Chestnut Street Philadelphia